The building which has an area of 1,650 m2 has been manufactured with prefabricated lightweight steel construction system by using seamless construction technology. Steel carcass construction of the building has been completed by on-site installation of the profiles drawn by the purpose-designed machinery lines af ter static studies specific to the project and other solutions regarding details. Af ter this, building construction has been completed by installing insulation materials, indoor and outdoor claddings, all joineries and other materials belonging to the building.